IMPLEMENTATION PLAYBOOK
dotcollab

Rolling out dotcollab.
A 90-day adoption plan.

How a CTO takes an engineering org from first training
to full multi-agent coordination — measured at every gate.

Rollout philosophy

Land and expand — never big-bang.

We don't flip a switch org-wide. We prove value on two teams, measure hard, and only expand when the numbers earn it.

Measure, then scale

Every phase ends at a go / no-go gate with explicit KPI targets. No target hit, no expansion.

Champions first

Start with two motivated teams already feeling agent-collision pain — they become internal proof and evangelists.

Humans stay in control

Governance is on from day one — agents propose, humans approve. Adoption never outruns oversight.

The plan at a glance

Four phases. Twelve weeks to full adoption.

1
Foundation
Weeks 1–2

Setup & training

  • Connect IDEs & agents via MCP
  • Org → project → workspace setup
  • Hands-on training + playbook
2
Pilot
Weeks 3–6

Two teams live

  • 2 champion teams on real work
  • Baseline vs. live metrics
  • Weekly feedback loop
3
Expansion
Weeks 7–10

Scale to the org

  • Roll to remaining teams
  • Standardize workflows
  • Cross-team coordination
4
Full adoption
Weeks 11–12+

Default way of working

  • Company-wide standard
  • Governance & spend controls
  • Quarterly KPI review
Gate A · end wk 2 Gate B · end wk 6 Gate C · end wk 10 Steady state · wk 12+
Phase 1 · Weeks 1–2

Foundation & introduction training.

Stand up the workspace and get people comfortable before any real work moves. Low stakes, high clarity.

  • Technical setup: connect Cursor, Claude Code, Copilot via one MCP URL; map org → projects → workspaces with scoped roles.
  • Introduction training: two 90-minute sessions — one for engineers, one for leads — on shared context, work claiming, and decision locking.
  • Adoption playbook: a one-page "how we work here" — when to claim, when to lock a decision, how approvals flow.
  • Baseline capture: record today's numbers (collisions, token spend, cycle time) so the pilot has a before.

Exit criteria — Gate A

100%

Pilot engineers trained & workspace access provisioned

All agents

Each dev's agents connected via MCP and visible in the workspace

Baseline set

Pre-adoption KPIs recorded for the 2 pilot teams

Phase 2 · Weeks 3–6

Pilot: two teams on real work.

Pick two teams already feeling the pain — ideally sharing a repo. Run their normal sprints inside dotcollab and watch the numbers move.

  • Who: 2 teams, 5–12 engineers each, each already running 2+ agents.
  • What: real features, not a sandbox — shared context, work claiming, and human-approved decision locking in daily use.
  • Cadence: weekly 30-min review with the champions; KPIs tracked live against the baseline.
  • Support: a named founder / CSM on a direct channel for the whole pilot.

Exit criteria — Gate B

−50%

Agent collisions / overwrites vs. baseline

−30%

Tokens per task via shared context

≥80%

Decisions logged & locked with an owner

≥8/10

Team would be "annoyed to lose it" (retention signal)

Phase 3 · Weeks 7–10

Expansion — scale what worked.

Exit criteria — Gate C

≥80%

Of engineers onboarded & weekly-active in a workspace

≥3

Cross-team coordination flows running (shared decisions / handoffs)

Stable

Pilot KPI gains hold as usage scales — no regression

Take the workflows the champions validated and roll them to the rest of the org, team by team — not all at once.

  • Sequenced rollout: onboard remaining teams in waves, each led by a trained champion from the pilot.
  • Standardize: promote the pilot's playbook to the org default — naming, claiming, and decision conventions.
  • Cross-team context: connect projects so decisions and work ownership are visible across team boundaries.
  • Enable governance: turn on spend visibility and audit reporting for engineering leadership.
Phase 4 · Weeks 11–12+

Full adoption — the default way of working.

Company-wide standard

Every team coordinates in dotcollab. New hires and new agents onboard into it by default, day one.

Governance at scale

Human-approved decisions, full audit trails, and per-agent spend controls visible to engineering leadership.

Agent CVs compound

Agents accrue a track record; leaders route work to proven agents and clone them into new teams.

Quarterly KPI review

The scorecard becomes a standing ops review — coordination, cost, governance, and velocity, tracked every quarter.

How we measure success

The adoption scorecard.

MetricBaseline (today)Target (90 days)How measured
Adoption
Engineers onboarded & weekly-active≥ 80%workspace analytics
Agents connected via MCP0≥ 90%connected-agent registry
Coordination
Agent collisions / silent overwrites · wkhigh −50%merge-conflict + claim logs
Duplicated-work incidents · wkhigh −40%work-ownership ledger
Work claimed before execution0%≥ 90%claim-rate metric
Cost
Tokens per task100% −30%shared-context savings
Agent spend per engineer / mounmanagedvisible & cappedper-agent spend report
Governance
Decisions logged & locked with owner< 20%≥ 90%decision ledger
Agent actions human-approvedad hoc100% of gated actionsapproval audit
Velocity
Feature cycle time100% −15–25%issue lifecycle
Context-rebuild time per session15–30 min near-zerosession start telemetry
Decision gates

We only expand when the numbers earn it.

Each phase ends at a gate. Miss the target and we hold, adjust, or stop — before spending on the next phase.

Gate A · wk 2

Ready to pilot? Pilot teams trained, all agents connected via MCP, and baseline KPIs captured. → proceed to pilot.

Gate B · wk 6

Does it work? Collisions down ≥50%, tokens/task down ≥30%, ≥80% decisions locked, and the teams would hate to lose it. → expand. If not — stop cheaply, two teams only.

Gate C · wk 10

Does it hold at scale? ≥80% of engineers active, cross-team flows live, and pilot gains stable with no regression. → go to full adoption.

Steady · wk 12+

Institutionalize. Quarterly KPI review owns the scorecard; governance and spend controls run continuously.

dotcollab

In one quarter: from agent chaos
to a coordinated org.

90 days
to full adoption
2 teams
pilot before any org-wide spend
−50%
agent collisions, gated & proven
−30%
token cost per task

Measured, gated, reversible — and fully under human control the whole way.

1 / 10
navigate  ·  G overview  ·  N notes  ·  F fullscreen

Overview · click to jump

Speaker notes